Location and accessibility

The area surrounding ORIX benefits from a dense and dynamic economic environment, strengthened by the presence of numerous well-established companies. This concentration creates multiple opportunities for collaboration and fosters business-to-business exchanges.

ZIMEYSA also offers a wide range of services in the immediate vicinity of the project, including restaurants and cafés, as well as shops and facilities dedicated to sports and leisure activities, such as a swimming pool and tennis courts.

By car

5 minutes from the A1 motorway

By bus

3 minutes from the Satigny, Les Maladières and Meyrin, Marcinhes stops

By train and on foot

5 minutes from ZIMEYSA train station

By bike

2 minutes from ZIMEYSA train station and 17 minutes from the airport

A building
for your business

The ORIX project, located at 10 rue de la Bergère in the heart of ZIMEYSA, is a condominium building designed to accommodate artisanal, light industrial and administrative activities. It offers a rare opportunity to acquire your own industrial premises in Geneva, within a new building that meets the technical standards of the sector.

Delivered in a basic industrial configuration, the spaces provide a high degree of flexibility for fit-out, making them suitable for production, assembly, technical laboratories, showrooms or offices linked to industrial activities, in a functional environment designed for operational efficiency.

Developed by REIS, the project totals nearly 17,224 sqm of condominium space, including:

  • a high-capacity logistics ground floor,
  • 4 industrial floors of 2,800 sqm each, divisible from 273 sqm,
  • a top-floor level with terraces,
  • a basement divided between parking, van delivery areas and technical rooms,
  • generous ceiling heights (up to 4.6 m on the ground floor and 4.24 m on upper floors),
  • a 4-ton freight lift (W 2.40 m, D 2.95 m, H 2.50 m; doors 2.30 x 2.50 m) and easy service access,
  • reinforced floor load capacity (1,500 kg/sqm on the ground floor and 800 kg/sqm on upper floors),
  • numerous parking spaces.
Available
Reserved
Sold

Available spaces

Key benefits

100% freehold ownership

Becoming an owner within an industrial condominium scheme means turning rent into an investment, securing your location and building a long-term asset. This freehold model offered at ORIX provides financial stability, protection against rising rents and complete freedom of layout. A rare opportunity in Geneva to sustainably enhance your business infrastructure.

Strategically located

The project benefits from a strategic location, just 5 minutes from the A1 motorway and a 5-minute walk from ZIMEYSA train station, ensuring fast connections to the city center and the Greater Geneva area. Several bus stops are within a 3-minute walk.

The site also includes dedicated pedestrian and cycling routes as well as 96 bicycle parking spaces. In addition, it offers 66 underground parking spaces as well as 10 outdoor spaces designated for light commercial vehicles.

Sustainable

ORIX adopts a sustainable approach through vertical densification, reducing land use, and an HPE-certified design, allowing savings on additional property tax for a period of 20 years. The building incorporates low-carbon materials, a green roof, photovoltaic panels, as well as landscaped surroundings and an internal patio, enhancing thermal comfort and natural light.

Modular

ORIX offers exceptional flexibility in layout, thanks to its condominium model, enabling companies to acquire spaces tailored to the evolution of their needs. Shared governance ensures transparent and adaptable management, while the pooling of technical infrastructure provides ideal modularity for SMEs, artisans and light industrial players, supporting the long-term sustainability of their activities.

Image gallery

Key figures

1
atrium providing optimal natural light across all floors
2.85 m.
maximum vehicle height permitted in the basement
4
freight lifts with a capacity of 4 tonnes (W 2.40 m, D 2.95 m, H 2.50 m, doors 2.30 x 2.50 m)
From 4.2 to 4.6m.
gross floor-to-ceiling heights
723 sqm
of accessible terraces on the top floor
800 kg/sqm
1500kg/sqm
permitted load capacity on upper floors / ground floor
From 273 sqm
minimum unit size 2,800 sqm total floor area per level
Q1 2029
delivery date
17,224 sqm
total condominium area

Timeline

Building permit fully approved

Q1 2026
Q1 2026

Building permit fully approved

Q4 2026

Start of construction

Q4 2026

Start of construction

Estimated project completion

Q1 2029
Q1 2029

Estimated project completion

Project stakeholders

News

Contact

Anne-Pascale Marchand

Head of Industry & Logistics
Mobile: +41 79 272 51 42
Tel: +41 22 707 46 00
Email: apm@spgpartner.ch

Madjid Massih

Head of Commercial and Residential Services
Mobile: +41 79 615 42 90
Tel: +41 22 319 85 79
Email: commercial@comptoir-immo.ch